A Kubota DC70 Undercarriage Parts Order: From Part-Number List to Loading

This is a real undercarriage order for a Kubota DC70 customer in Southeast Asia: a dealer servicing several DC70 machines placed one consolidated list of track and drive-axle parts before the harvest season. This note walks through exactly how the order moved from the part-number list to loading, so buyers can see the information we need and the way the parts are checked, packed and shipped.

Because every machine shares the same chassis layout, the customer ordered the wear parts as a set — track rollers, axle cases, half axles, seals and the small locking parts — rather than buying them one at a time after a breakdown. Buying the group together keeps the seals and fasteners matched and reduces downtime during the peak season.

How to read this case. Prepared by the Agri Part Supply spare-parts team. The part numbers, quantities and process below follow the written catalogue/BOM and the customer’s confirmed order; they are not a price list. Final pricing, lead time, shipping method and warranty depend on quantity, destination port and the arrangement agreed in the written quote.

1. The customer’s part-number list

The customer sent the machine model (Kubota DC70) with each part number on its own line and the quantity beside it. Every line below was matched to the catalogue before the proforma invoice (PI) was issued, so nothing was substituted by guesswork.

2. Confirming fitment and the quote

Each part number was checked against the DC70 parts catalogue and the system BOM. The left and right axle cases and half axles were confirmed as a handed pair, and the two oil-seal numbers (5T072-2321 and 5T070-2321) were kept separate because they are not interchangeable. A single PI then listed every line, the unit price, the total and the agreed shipping terms.

3. Preparing and packing the parts

Before packing, each part was inspected for clean machining and the seals were checked for a smooth lip. Metal parts were coated with anti-rust oil and sealed in plastic, then packed in cartons with the part number and quantity marked on the outside. Fragile seals and the long half axles were separated and braced so they could not be crushed or bent in transit.

4. Loading and shipping

The cartons were palletised and loaded together with the rest of the shipment, with a packing list showing the gross and net weight and the number of cartons. The customer received the commercial invoice, packing list and shipment details for customs clearance, and the container was booked to the destination port in the agreed window.

Key takeaways for buyers

What is the best way to send an order?

Send the machine model and a list with one part number per line and the quantity beside it, plus a photo of the old part or nameplate when a number is unclear. This lets us confirm every line against the catalogue before quoting.

Should seals and fasteners be ordered together with the main parts?

Yes. When an axle case or roller is opened, fit new oil seals and replace the locking nuts, washers and pins rather than reusing worn ones, so the repair stays sealed and secure.

How are long axles and seals protected?

Half axles are oiled, bagged and braced separately, and seals are packed so nothing presses on the sealing lip. The packing list identifies every carton for easy receiving.

Planning a DC70 undercarriage order? Send your part-number list and quantities and we will confirm each line against the catalogue and return one consolidated quote with shipping to your port.